Clarity in the details. Control from the outset.
Turn your drawings into a structured understanding of the work ahead. We prepare quantity assessments and cost forecasts for our own designs and for clients with existing third-party drawings, establishing a clear basis for procurement and comparison.
Discuss Your ProjectThe detail behind the vision.
A coordinated scope, shaped around the needs of your project.
01Bill of Quantities (BOQ)
Itemized schedules with descriptions, units, and measured quantities organized by trade, making tender responses easier to assess on a comparable basis.
02Detailed material take-offs
Measure building elements from available architectural, structural, and MEP drawings, recording assumptions and identifying information that needs clarification.
03Project cost forecasting
Develop project-specific forecasts informed by the drawing stage, specifications, and procurement context. Assumptions and exclusions are made explicit for informed decisions.
04Third-party drawing review
Work with your existing design package, identify missing measurement information, and organize clarifications before finalizing the quantity documentation.
A clear process. A considered outcome.
Review drawing completeness and the required output.
Measure and classify the work by element and trade.
Prepare the BOQ and project-specific forecast.
Explain assumptions and resolve outstanding queries.
Tangible outputs. Lasting clarity.
The final deliverables are agreed with you at the start, according to project scale and scope.
- ↗Itemized Bill of Quantities
- ↗Material take-off schedules
- ↗Project cost assessment
- ↗Assumptions & clarification register
You do not need to redesign your project with us. Share your existing drawing package and the stage you have reached.
Request a Consultation